Company: Industrial assembly company / ETTERKIB / Sonalgaz group subsidiary.
Grade:Electrical Installation Team Leader. December 2008 to February 2010.
Location: Power plant gas Turbine Larbaa (4 x 139.9 Mw) and AIS substation (60 / 22OKV).
-Role and responsibilities (Electrical assembly of the AIS substation):
- Responsible for the daily activity of the staff (13 people).
- Installation of the circuit breakers, which are used to switch off the current.
- Installation of disconnectors, which are used to isolate a part of the substation.
- Installation of integrated earthing devices (similar to disconnectors), surge arrester.
- Installation of power transformers 220/60/30 kv and 30 / 10kv.
- Mounting of measuring transformers (Current Transformers, Voltage Transformers, Measurement Units).
- Installation of busbars.
- Role and responsibilities (Electrical installation of the power Plant ):
- Assembly of the coaxial ducts of each turbine.
-Installation, installation and connection of AIRO lighting fixtures and
Main transformer, filling and auxiliaries.
-Installation of disconnector, T.T and TC, surge arrester of the station of each turbine.
-Mounting of supports and installation of batteries for each turbine.
التعليم
II- Studies:
A- Secondary education:
Degree: BAC Electro technique.Year: 92/93.
Location: Cherchell Technical College.
B- University studies:
Degree: Diploma of Applied University Studies in Electrotechniques.
Year: 99